Pedestrian Bridge Construction, Pile Installation, Pedestrian Bridge, Floating Dock
Scriber Lake Park
Date:
2025
Client:
City of Lynnwood
Location:
Scriber Lake; Lynnwood, Washington
Services Rendered:
1,652 LF Trail and Raised FRP Boardwalk through Wetland utilizing Steel Piles, Installation of Floating Dock and Gangway; 55' Steel Pedestrian Bridge